江苏快三开奖结果

  • <tr id="4LqzUE"><strong id="4LqzUE"></strong><small id="4LqzUE"></small><button id="4LqzUE"></button><li id="4LqzUE"><noscript id="4LqzUE"><big id="4LqzUE"></big><dt id="4LqzUE"></dt></noscript></li></tr><ol id="4LqzUE"><option id="4LqzUE"><table id="4LqzUE"><blockquote id="4LqzUE"><tbody id="4LqzUE"></tbody></blockquote></table></option></ol><u id="4LqzUE"></u><kbd id="4LqzUE"><kbd id="4LqzUE"></kbd></kbd>

    <code id="4LqzUE"><strong id="4LqzUE"></strong></code>

    <fieldset id="4LqzUE"></fieldset>
          <span id="4LqzUE"></span>

              <ins id="4LqzUE"></ins>
              <acronym id="4LqzUE"><em id="4LqzUE"></em><td id="4LqzUE"><div id="4LqzUE"></div></td></acronym><address id="4LqzUE"><big id="4LqzUE"><big id="4LqzUE"></big><legend id="4LqzUE"></legend></big></address>

              <i id="4LqzUE"><div id="4LqzUE"><ins id="4LqzUE"></ins></div></i>
              <i id="4LqzUE"></i>
            1. <dl id="4LqzUE"></dl>
              1. <blockquote id="4LqzUE"><q id="4LqzUE"><noscript id="4LqzUE"></noscript><dt id="4LqzUE"></dt></q></blockquote><noframes id="4LqzUE"><i id="4LqzUE"></i>
                Welcome to Ningguo Dongfang Wear-resistant Material Co.,Ltd!

                News

                Location:Home > News > News
                Kibo Mining in "advanced discussions" with Ministry of Energy for Mbeya Coal to Power Project
                Publisehd Time:2020-09-22  View Times:1499  

                 

                Kibo Mining is in advanced discussions with Tanzania Electric Supply Company (TANESCO) and the Ministry of Energy to sign a Power Purchase Agreement (PPA) for its flagship coal to power project.

                The announcement comes at a time of press speculation, which suggested that a PPA had already been signed for the 300Mw Mbeya Coal to Power Project (MCPP).

                “Contrary to press speculation, the company has not yet signed a PPA,” Kibo said in a statement.

                “However, it remains in advanced discussions and the PPA will enable the company to move towards execution and conclusion of the final development phase of the MCPP.”

                The Mbeya Coal to Power Project (‘MCPP’), comprises the development of the Mbeya Coal Mine, a 1.5Mt p/a mining operation and the Mbeya Power Plant, a 300 MW mine-mouth thermal power station.    

                The Mbeya Coal Mine has a defined 120.8 Mt NI 43 101 thermal coal resource. 
                 

                Related stories:

                50 new mining licences for Rwanda as mining investment target set for $2 billion

                Coal to continue to be leading power generator to developing countries, says CEO

                Anglo American sells its New Largo thermal coal project for $71million

                 

                The 300 MW mouth-of-mine thermal power station has long term scalability to 1000MW, with a full Power Feasibility Study highlighting an annual power output target of 1.8 GW based on annual average coal consumption of 1.5 Mt. 

                An Integrated Bankable Feasibility Study report for the entire project indicated total potential revenues of US$ 7.5-8.5 billion over an initial 25-year mine life, post tax equity IRR between 21-22%, debt pay-back period of 11-12 years and a construction period of 36 months.  

                Copyright © 2016 Ningguo Oriental grinding materials Limited by Share Ltd , All Rights Reserved

                Address: No. 47 Ningyang West Road, Ningguo high tech Development Zone, Anhui TECHNOLOGY SUPPORT:GOVLAND


                OUR WECHAT